← Back to Portfolio

Test Execution Report

Sprint 12 - E-Commerce Application Testing

Reporting Period: December 16 - December 20, 2024

247
Total Test Cases
229
Passed
12
Failed
92.7%
Pass Rate

Test Execution Progress

92.7% Passed

Status: Sprint testing completed successfully with high pass rate

Test Environment

Environment: Staging
URL: https://staging.shopeasy.com
Build Version: v2.1.4
Database: MySQL 8.0.33
Test Period: Dec 16-20, 2024
Total Execution Time: 38 hours
Automation Rate: 78%
Manual Tests: 22%
Browsers Tested:
• Chrome 119.0.6045.105
• Firefox 120.0
• Safari 17.1
• Edge 119.0.2151.58
Devices:
• Desktop (Windows, macOS)
• Mobile (iOS, Android)
• Tablet (iPad, Samsung)
• Various screen sizes

Test Results by Module

Module Total Tests Passed Failed Skipped Pass Rate Status
User Authentication 45 42 3 0 93.3% PASS
Product Catalog 38 36 2 0 94.7% PASS
Shopping Cart 32 29 2 1 90.6% PASS
Checkout Process 28 25 3 0 89.3% FAIL
Payment Processing 25 23 1 1 92.0% PASS
Order Management 31 30 0 1 96.8% PASS
User Profile 22 21 1 0 95.5% PASS
Search & Filters 26 23 0 3 88.5% PASS

Defect Analysis

Critical Issues

2

Issues that block core functionality

  • Login failure with valid credentials
  • Payment processing timeout

High Priority

5

Important issues affecting user experience

  • Cart count display issue
  • Search results pagination
  • Product image loading delays

Medium Priority

4

Minor functionality issues

  • Form validation messages
  • UI alignment issues
  • Email notification delays

Low Priority

1

Cosmetic or minor issues

  • Footer link styling

Performance Metrics

Page Load Time

2.3s

Average across all pages (Target: < 3s)

✓ Within acceptable range

API Response Time

145ms

Average API response time (Target: < 200ms)

✓ Excellent performance

Concurrent Users

500

Maximum tested without degradation

✓ Meets requirements

Error Rate

0.2%

System error rate during testing

✓ Below 1% threshold

Coverage Analysis

Coverage Type Percentage Status Notes
Functional Coverage 95.2% EXCELLENT All critical user journeys covered
Regression Coverage 88.7% GOOD Automated regression suite executed
Browser Coverage 92.0% EXCELLENT All major browsers and versions tested
Device Coverage 85.5% GOOD Desktop, mobile, and tablet coverage
API Coverage 98.1% EXCELLENT Comprehensive API endpoint testing

Risk Assessment & Recommendations

High Risk Areas:

Recommendations:

Team Performance

Test Execution

Planned: 247 test cases

Executed: 241 test cases (97.6%)

Automation: 192 test cases (78%)

Defect Detection

Total Defects: 12

Detection Rate: 4.9%

Avg. Time to Report: 2.3 hours

Schedule Adherence

Planned Duration: 5 days

Actual Duration: 5 days

On-time Delivery: 100%

Test Sign-off Status

Prepared by:
Sarah Johnson, Lead QA Engineer
Date: December 20, 2024
Reviewed by:
Mike Davis, QA Manager
Date: December 21, 2024
Approved by:
Lisa Chen, Project Manager
Date: December 21, 2024
Recommendation: Do not proceed to production until critical defects are resolved. Estimated time for fixes: 2-3 days.